LOC Renewables to Help Woen Jinn Enhance Cable-Laying Capabilities

03-02-2018

LOC Renewables has been contracted through Longitude Engineering to undertake a month-long feasibility study on behalf of Taiwanese subsea cable installer, Woen Jinn Harbor Engineering. The agreement will see the Longitude team assess a cable lay barge for Woen Jinn and advise on the specifications and conversion work required to fit the barge for offshore wind operations. Taiwan is aiming to develop 3GW of offshore wind capacity by 2030.



Source: subseaworldnews.com


» Read more

« Back